philippines Agent of boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :philippines Agent of boiler
  • Supply Capacity : 10 units/month :philippines Agent of boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Munich Re worldwide | Munich Re

    The Boiler Inspection and Insurance Company of Canada. John Mulvihill President and Chief Executive Officer. 390 Bay Street, Suite 2000 Toronto, ON, M5H 2Y2. Tel.: (416) 363-5402 Email: [email protected] .biico.comGet Price

  • Savills | The Street, Lympne, Hythe, Kent, CT21 4LQ

    The Castle Great Hall Bar, Great Hall, Ante Room, Cloakroom, Harry's Room, Dressing Room, Ceremony Room, Reception, Cloakroom, Temporary Bar, Store Room 1, Laundry, Kitchens 1 - 3, 2 Further Cloakrooms, Store Room 2, Accessed from Outside is a Further Storage Areas and Gardener's WC, Boiler Room (Cellar) is accessed via Kitchen 2Get Price

  • Savills | The Street, Lympne, Hythe, Kent, CT21 4LQ

    The Castle Great Hall Bar, Great Hall, Ante Room, Cloakroom, Harry's Room, Dressing Room, Ceremony Room, Reception, Cloakroom, Temporary Bar, Store Room 1, Laundry, Kitchens 1 - 3, 2 Further Cloakrooms, Store Room 2, Accessed from Outside is a Further Storage Areas and Gardener's WC, Boiler Room (Cellar) is accessed via Kitchen 2Get Price

  • Savills | The Street, Lympne, Hythe, Kent, CT21 4LQ

    The Castle Great Hall Bar, Great Hall, Ante Room, Cloakroom, Harry's Room, Dressing Room, Ceremony Room, Reception, Cloakroom, Temporary Bar, Store Room 1, Laundry, Kitchens 1 - 3, 2 Further Cloakrooms, Store Room 2, Accessed from Outside is a Further Storage Areas and Gardener's WC, Boiler Room (Cellar) is accessed via Kitchen 2Get Price

  • Energy Resource Guide - Philippines - Renewable Energy

    Waste-to-energy technology options such as gasification for boiler and gas turbine, incineration, co-firing, methane separation technologies, gas-to-liquids and feed stock type. seeking agents or distributors in the Philippines are encouraged to use the services of the U.S. Commercial Service Philippines to find agent/distributors.Get Price

  • THE NATIONAL BUILDING CODE OF THE PHILIPPINES - CHAN

    B. 08. Boiler Room. Any room containing a steam or hot water boiler. B.09: Buildable Are. The remaining space in a lot after deducting the required minimum open spaces. B.10: Building. Any structure built for the support, shelter, or enclosure of persons, animals, chattels, or property of any kind. B.11: Building, Existing.Get Price

  • THE NATIONAL BUILDING CODE OF THE PHILIPPINES - CHAN

    B. 08. Boiler Room. Any room containing a steam or hot water boiler. B.09: Buildable Are. The remaining space in a lot after deducting the required minimum open spaces. B.10: Building. Any structure built for the support, shelter, or enclosure of persons, animals, chattels, or property of any kind. B.11: Building, Existing.Get Price

  • Savills | The Street, Lympne, Hythe, Kent, CT21 4LQ

    The Castle Great Hall Bar, Great Hall, Ante Room, Cloakroom, Harry's Room, Dressing Room, Ceremony Room, Reception, Cloakroom, Temporary Bar, Store Room 1, Laundry, Kitchens 1 - 3, 2 Further Cloakrooms, Store Room 2, Accessed from Outside is a Further Storage Areas and Gardener's WC, Boiler Room (Cellar) is accessed via Kitchen 2Get Price

  • Energy Resource Guide - Philippines - Renewable Energy

    Waste-to-energy technology options such as gasification for boiler and gas turbine, incineration, co-firing, methane separation technologies, gas-to-liquids and feed stock type. seeking agents or distributors in the Philippines are encouraged to use the services of the U.S. Commercial Service Philippines to find agent/distributors.Get Price