boiler for rubber factory plant mill machinery

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :boiler for rubber factory plant mill machinery
  • Supply Capacity : 10 units/month :boiler for rubber factory plant mill machinery
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Elements of Cost in Cost Accounting - Economics Discussion

    The following are examples of indirect factory expenses: (i) Rent, rates and insurance in relation to factory (ii) Depreciation, repairs, maintenance on factory building, plant etc. (iii) Welfare and medical expenses (iv) Expenses of service department such as tool-room, boiler-house, drawing-office, pro­duction and planning center.Get Price

  • Press Releases Archive - Digital Journal

    Introducing Western Boiler Training, BOGE Rubber & Plastics, BWI Group, Continental – 2022 – 2027 - 4 Craig's Record Factory is a Nostalgic Journey Through the 70's and 80's - 4 Get Price

  • Grover Shoe Factory disaster - Wikipedia

    The Grover Shoe Factory disaster was an industrial explosion, building collapse and fire that killed 58 people and injured 150 when it leveled the R. B. Grover shoe factory in Brockton, Massachusetts on March 20, 1905. Following a boiler explosion, the four-story wooden building collapsed and the ruins burst into flames, incinerating workers trapped in the wreckage.Get Price

  • Online List of Texas Workers Compensation Class Codes

    0037 Farm Machinery Operation—By Contractor & Drivers. 3643 Boiler Control Panel Mfg. 3643 Circuit Breaker Mfg.—Electrical. 3643 Electric Motor Repair—Industrial. 4751 Carbon Processing Plant—From Lignite. 4751 Synthetic Rubber or Rubber Intermediate Mfg.Get Price