project on power plant of boiler Agent mechanical enginnering

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :project on power plant of boiler Agent mechanical enginnering
  • Supply Capacity : 10 units/month :project on power plant of boiler Agent mechanical enginnering
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Water Handbook - Boiler Blowdown Control | SUEZ

    The line must also be located so that boiler feedwater or chemical feed solution does not flow directly into it. The size of the lines and control valves depends on the quantity of blowdown required. Figure 13-4 illustrates a typical location in a steam drum for …Get Price

  • Control Techniques for Carbon Monoxide Emissions

    ----- LIST OF FIGURES PAGE 5-2 Firetube Boiler 5~13 5-3 General Trend of Smoke, Gaseous Emissions, and Efficiency 5-22 Versus the Percent Excess Air for Oil-Fired Residential Heaters 6-1 Steps Required for Successful Incineration of Dilute Fumes 6-6 6-2 Coupled Effects of Temperature and Time on Rate of 6-7 Pollutant Oxidation 6-3 Schematic Get Price

  • Control Techniques for Carbon Monoxide Emissions

    ----- LIST OF FIGURES PAGE 5-2 Firetube Boiler 5~13 5-3 General Trend of Smoke, Gaseous Emissions, and Efficiency 5-22 Versus the Percent Excess Air for Oil-Fired Residential Heaters 6-1 Steps Required for Successful Incineration of Dilute Fumes 6-6 6-2 Coupled Effects of Temperature and Time on Rate of 6-7 Pollutant Oxidation 6-3 Schematic Get Price

  • Chapter 283 - Telephone, Gas, Power and Water Companies

    Oct 02, 2015 · Furnace or boiler replacement and propane fuel tank purchase funds provided shall be reflected on the residential retail end use customer's electric service or gas account, as applicable, for the premises on which the replacement heating furnace or boiler equipment or propane fuel tank is located.Get Price

  • Water Handbook - Preboiler & Industrial Boiler Corrosion

    Off-line boiler corrosion is usually caused by oxygen in-leakage. Low pH causes further corrosion. Low pH can result when oxygen reacts with iron to form hydroferric acid. This corrosion product, an acidic form of iron, forms at water-air interfaces. Corrosion also occurs in boiler feedwater and condensate systems.Get Price